A clause that works only on paperĀ 

A cross-border dispute clause can be legally sound and still be inaccessible to the business relying on it. For SMEs, the real test is whether the pathway remains usable when trust, cashflow and cooperation are under pressure.
Author(s): Catherine Green

A dispute clause is usually agreed when everyone is still getting along. The deal is moving, the relationship is promising and the possibility of a serious breakdown feels remote. That is precisely when an apparently safe clause can slip through without enough scrutiny.

Imagine a small New Zealand luxury food importer entering a supply arrangement overseas. The contract sends disputes to the supplier’s home courts. Months later, payments, product quality and delivery are contested. Evidence sits in two countries, documents need translation and the importer has limited cash and no practical support in the chosen forum. Its legal rights may be perfectly respectable. Its ability to exercise them is another matter.

The problem is not the foreign court. It is the mismatch between the process and the person expected to use it. A remedy that exists only in theory is not a meaningful remedy for the business relying on it.

Start with the user, not the forum

Cross-border drafting often begins with familiar questions: which law, which court, which arbitral seat? Those questions matter, but they arrive too early if we have not first understood the business. The better starting point is: what will these parties realistically need when trust has fallen away?

For an SME, process design is not an abstract exercise. It is risk management. A clause must account for cashflow, language, access to advice, the location of evidence, the commercial relationship and the likely value of a claim. A beautifully drafted process that costs more to run than the dispute is worth is not sophisticated. It is unusable.

Tradition or innovation is the wrong choice

Traditional processes offer important protections. Courts and arbitration bring authority, procedural safeguards, finality and routes to enforcement. Newer or more flexible approaches – including online meetings, expedited arbitration, mediation, early neutral evaluation and institutional triage – can improve speed, access and fit.

The task is not to choose one camp. It is to combine legitimacy with usability. Parties seem to understand this intuitively: in Queen Mary University of London’s 2021 international arbitration survey, 59 per cent of respondents preferred arbitration in conjunction with alternative dispute resolution, while a further 31 per cent preferred arbitration on its own. The strongest design often preserves a credible binding backstop while creating earlier opportunities to solve the problem proportionately.

Five questions that expose hidden friction

Before selecting a process, it helps to test the proposed clause against five practical questions.

Distance. How far apart are the parties in language, legal systems, commercial expectations and ideas about a legitimate process? Institutional distance is not simply geography. Even close neighbours can make assumptions about notice, evidence or negotiation that do not travel well.

Value. What is truly at stake? The invoice amount matters, but so may continuity of supply, reputation, intellectual property, precedent or access to a market. The process should reflect the whole commercial problem.

Capacity. Can each party understand, fund and operate the pathway? Consider who will gather evidence, attend meetings across time zones, arrange translations and manage the matter alongside normal business.

Leverage. What will make the other party engage? A conversation without a credible next step can drift. Equally, an immediate threat of formal proceedings may destroy the room needed for a practical agreement.

Exit. If agreement is not possible, what kind of outcome is required and where must it work? The answer may point to a consent settlement, expert decision, court judgment or arbitral award. For international arbitration, the New York Convention provides a widely adopted framework for recognising arbitration agreements and enforcing foreign awards.

Turn the clause into an operating system

A good dispute clause does more than name a forum. It gives people an operating system for a difficult moment.

That system might begin with a named senior representative making direct contact within a short period. It might then provide for structured negotiation, followed by mediation or neutral evaluation. If those steps do not resolve the matter, an expedited or standard arbitration can deliver a binding result. Language, notice, document exchange, remote participation, time limits and the ability to seek urgent relief should be addressed rather than left to chance.

This need not become a rigid staircase that delays action. The clause can allow a party to bypass an early step where urgent interim protection is genuinely needed. It can set value thresholds, use documents-only procedures for smaller claims, or provide for a neutral to help choose the proportionate track. UNCITRAL’s Expedited Arbitration Rules, and NZIAC’s own tiered expedited rules, show how procedural security can be retained while time and cost are scaled to the dispute.

Why the institution matters

An institution is sometimes viewed as an extra layer of administration. In a cross-border dispute, it can be the element that makes the agreed process usable. A neutral institution can appoint decision-makers, manage timetables, hold funds, support communication and keep the matter moving when the parties cannot agree on the next procedural step.

For smaller businesses in particular, that structure provides a credible procedural home without requiring them to invent the process during a crisis. It also strengthens the backstop behind negotiation and mediation: the other party knows that if agreement is not reached, the dispute has somewhere to go.

Design for the difficult day

No clause can remove all uncertainty. Nor should every commercial disagreement be funnelled through an elaborate sequence. The goal is a pathway proportionate to the parties, the transaction and the likely dispute – one that preserves the relationship where possible and provides finality where necessary.

The best process is the one parties can use when trust has collapsed. That is the standard against which cross-border clauses should be tested. For SMEs, proportionality is not a convenience at the margins of access to justice. It is often what makes access to justice real.

Other resources you might like

If you found this article helpful and are interested in learning more, there is a wealth of other resources available on our website. We have a wide array of articles and guides on a variety of topics, each designed to provide you with a deeper understanding of the subject matter. We encourage you to explore these resources and deepen your knowledge.

A person is highlighting text on a printed contract document with a yellow marker. The document, which discusses the UK Supreme Court's return to an orthodox liquidated damages approach, is placed on a wooden desk next to a keyboard and mouse. Various sections and terms have some text already highlighted.

UK Supreme Court returns to orthodox liquidated damages approach

The UK Supreme Court in its recent judgment in Triple Point Technology v PTT Public Company[1] has brought welcome clarity in relation to the drafting and interpretation of liquidated damages clauses[2] in construction, commercial and technology contracts. The judgment also deals with the relationship between liquidated damages clauses and caps on liability. We summarise the judgment and provide some key points for drafting liquidated damages clauses and related caps on liability.
A close-up of a person's hand resting on a desk, with a set of golden scales in the foreground. They are in front of a window. There are stacks of books and a spiral notebook on the desk. The scales symbolize balance and justice.

It’s up to the parties to frame the claim: court of appeal overturns decision where judge became ā€œthird manā€ to the proceedings

The Court of Appeal of England and Wales overturned a High Court decision where the Judge held a warranty had been breached on a basis which differed substantially from how the claim had been notified, pleaded and argued.
Two construction workers stand in an unfinished building. One worker, in a red shirt and red helmet, converses with another worker, in a dark shirt, blue overalls, and a white helmet. The white-helmeted worker gestures while explaining something. Tools and materials are visible in the background.

Council wins in battle with contractor

In Thomas Barnes & Sons plc v Blackburn with Darwen Borough Council [2022] EWHC 2598 (TCC) the English High Court dismissed a claim for wrongful termination from a contractor despite agreeing that they were entitled to an extension of time.