Leaky Home Case: Failure to obtain a building report results in reduction of damages for contributory negligence

Apportionment for contributory negligence allows a court to share the responsibility between parties in circumstances where the test for causation and remoteness of damage justifies it. It doesn’t mean a respondent will not be held liable for negligence, but it can affect the amount of damages awarded to a claimant, as Roberts v Jules Consultancy Limited (in liq) [2021] NZCA 303 has shown.
Author(s): Melt Strydom
A red cable car is pictured traveling uphill in an urban area with a lush green field, city buildings, and mountains in the background. The scene is bright and clear under a blue sky, resembling the clarity often sought in discussions about reduction of damages for contributory negligence.

Introduction

In Roberts v Jules Consultancy Limited (in liq), the New Zealand Court of Appeal dismissed an appeal to increase damages of $118,500 awarded by the High Court after it found a property manager breached the Fair Trading Act (the Act) when she failed to make full disclosure to a purchaser about the weathertightness of a multi-unit apartment building in central Wellington. 

Instead, the Court of Appeal allowed the property manager’s cross-appeal (in part), applying a 40 per cent reduction for the purchaser’s contribution to his own loss instead of the 15 per cent the High Court judge had allowed. 

A wooden judge's gavel rests on a desk in the foreground, while a man in a suit works on a laptop in the background, partially out of focus. Papers and a binder are also visible on the desk.

The facts

Mr Roberts (the Appellant) entered into a conditional agreement in February 2014 to purchase an apartment at the Sirocco Apartments (Sirocco) in Wellington for $397,000. He declared the agreement unconditional, in reliance on statements by the body corporate secretary and property manager, Ms Leloir (second respondent), that the only weathertightness issues related to the walkways, which had been fixed. After settlement, Mr Roberts discovered Sirocco suffered from serious weathertightness defects. Mr Roberts sued Ms Leloir and claimed losses of more than $600,000. 

The High Court found Ms Leloir’s statements were false and misleading and breached sections 9 and 14 of the Fair Trading Act 1986. The Judge awarded damages in the sum of $110,000, minus an apportionment for contributory negligence, calculated at a 15 percent reduction, because Mr Roberts failed to obtain a pre-purchase building report and did not request copies of the body corporate committee minutes. The Judge also awarded general damages for stress and inconvenience in the sum of $25,000. 

In assessing special damages, the Court compared the purchase price of the apartment with its market value in March 2014 when the misleading statements were made. 

Street view showing the distinctive round building of the New Zealand Parliament, known as the Beehive, on the left. To the right is a historic, classical-style building. Several cars are seen on the road, with trees and a traffic light in the foreground—much like a well-argued reduction of damages for contributory negligence.

Mr Roberts and Ms Leloir both appealed the High Court decision. 

Mr Roberts argued the High Court erred because the damages should have been assessed on the date of the hearing in November 2019 at the market value of the Sirocco apartment as if it had no defects. He also sought compensation for his share of the special levies raised to assess the damage at Sirocco as well as future costs of moving to alternative accommodation. Further to this, he argued, the Judge should not have reduced the damages for contributory negligence. 

In her cross-appeal, Ms Leloir argued that Mr Roberts did not suffer any loss, given that other Sirocco apartments like his sold for similar prices in 2014 and the reduction in contributory negligence should have been calculated at 40 per cent. 

The Court of Appeal decision

The Court of Appeal had to decide whether the Judge erred in her assessment of damages prior to any reduction being made for contributory negligence, whether she was wrong to reduce the damages for contributory negligence, and whether a reduction of 15 per cent was sufficient to recognise the contributory negligence. 

The Court of Appeal found Mr Roberts was not entitled to the future losses he claimed and that the Judge was correct in assessing loss at the date of the breach by using the sales price of a comparative unit as a proxy for the market value of Mr Roberts’ apartment in 2014. The Court of Appeal also found the Judge was correct not to award recovery of special levies and the estimated moving costs, as none of these costs had been incurred. 

In assessing contributory negligence, the Court of Appeal found a prudent purchaser would have obtained a pre-purchase inspection report from a qualified specialist, which would have identified any issues of watertightness at Sirocco. The Judge was therefore justified in concluding a prudent purchaser would have taken steps to find out more, including seeking minutes from the body corporate committee meetings. 

The Court of Appeal said Mr Roberts’ contribution to his own loss was understated and increased the reduction to 40 per cent because Mr Roberts was aware of the leaky building crisis generally and wanted to protect himself from that risk. His failure to obtain a building report was both negligent and causally potent. 

Two people in white shirts are reviewing a document together in an office setting. One person is holding the open document while the other points at a section on the pages. Both individuals are partially visible, focusing on the document.

As a result, the Court of Appeal dismissed Mr Roberts’ appeal and allowed the cross-appeal of Ms Leloir. Setting aside the High Court award for damages, it applied a 40 per cent reduction for Mr Roberts’ contribution to his own loss, and awarded $66,000 plus $15,000 in general damages. 

Conclusion

This case is a stark reminder that a party must take reasonable steps and care when entering property transactions, as it may impact on any damages a court may award. In calculating contributory negligence, a court will look at the parties’ relative blameworthiness and the causal potency of their respective failures that resulted in the loss suffered.

Other resources you might like

If you found this article helpful and are interested in learning more, there is a wealth of other resources available on our website. We have a wide array of articles and guides on a variety of topics, each designed to provide you with a deeper understanding of the subject matter. We encourage you to explore these resources and deepen your knowledge.

Australian Hague Rules: party to shipping dispute rails against arbitration clause

In Carmichael Rail Network Pty Ltd v BBC Chartering Carriers GmbH & Co KG, [1] the High Court of Australia assessed whether engagement in arbitration in a foreign jurisdiction could contravene law designed to protect cargo owners. The decision is an illustration of the stability of arbitration as a method of dispute resolution.
An eagle soars above a tranquil New Zealand lake reflecting rugged, green-carpeted mountains under a dramatic sky at sunset. The scene captures the serene and majestic essence of nature, with a stunning transparency as the eagle's reflection mirrors in the calm water below.

New Zealand still rated as global leader for public sector transparency, honesty and integrity

Transparency International has just released the 2021 Corruption Perception Index (CPI). New Zealand has retained its joint number one ranking along with Denmark, as having one of the least corrupt public sectors in the world. This year Finland joins the top-slot as third equal.

New Zealand’s score remains a “clean” 88/100, which is great news. However, the global average of 43/100 has also not moved. It has now been stagnant for ten years in a row. Two-thirds of the countries have scored below 50, indicting serious corruption problems. Of them, 27 have obtained their lowest scores ever. The figures reveal a worrying standstill in all regions of the world in the fight against public sector corruption. A summary of some of the issues raised in the CPI is below. The full report and supporting data can be found here.
A person is highlighting text on a printed contract document with a yellow marker. The document, which discusses the UK Supreme Court's return to an orthodox liquidated damages approach, is placed on a wooden desk next to a keyboard and mouse. Various sections and terms have some text already highlighted.

UK Supreme Court returns to orthodox liquidated damages approach

The UK Supreme Court in its recent judgment in Triple Point Technology v PTT Public Company[1] has brought welcome clarity in relation to the drafting and interpretation of liquidated damages clauses[2] in construction, commercial and technology contracts. The judgment also deals with the relationship between liquidated damages clauses and caps on liability. We summarise the judgment and provide some key points for drafting liquidated damages clauses and related caps on liability.