A recent decision of the Singapore High Court shone a spotlight on indemnity costs and when they will, and won’t, be granted following the unsuccessful challenge of an arbitral award. The decision highlighted the opposite principles in place between Singapore and Hong Kong when a losing party challenges the arbitrator’s award through the court system and fails. What are the underlying motivators for these differences, and how do they reflect the situation in New Zealand?
Author(s): Maria Cole
A person in a suit is sitting at a table with a gavel in the foreground and a book in their left hand. The focus is on the gavel, suggesting a legal or judicial setting. The background is blurred, emphasizing the foreground objects.

Singapore and the need for exceptional circumstances

The usual course in Singapore proceedings is for the Court to award a successful litigant party/party costs on a standard basis. This approach is known as “costs follow the event” or “loser pays”; however, there is often a substantial “but” involved, as it does not mean recovering all the costs that have been expended. Party/party costs on a standard basis are worked out according to set scales and invariably do not reimburse the “winner” the actual costs they have incurred. An award of actual costs is called “indemnity costs”. Exceptional circumstances are required to justify a departure from the usual set scale costs and for indemnity costs to be awarded.

The Singapore High Court recently confirmed that just because an application to set aside an arbitral award or to resist its enforcement is unsuccessful, that is not an “exceptional circumstance” in which indemnity costs may be ordered. [1]

The plaintiffs had made an unsuccessful application to set aside a partial arbitral award. The defendants sought to rely upon the default rule under Hong Kong law, which is that indemnity costs will be granted when an arbitral award is unsuccessfully challenged in court unless “special circumstances” can be shown. In their submissions on costs, the defendants (who had succeeded in the arbitration) argued that the plaintiffs had put them to considerable costs to fend off the challenge, which they said were “unmeritorious proceedings” that ought not have been brought in the first place. They highlighted that the parties had agreed to resolve their disputes in arbitration and honour any award made. The Court was asked to consider whether, in the absence of exceptional circumstances, indemnity costs should be awarded as a matter of course against a party who unsuccessfully applied to set aside or resist enforcement of an arbitral award. 

The image shows the national flag of Singapore waving on a flagpole against a clear blue sky. The flag consists of two horizontal bands, red on the top and white on the bottom, with a white crescent moon and five white stars in a circle in the upper left corner—the symbol that might inspire discussions on diverse matters, including cost implications of challenging an arbitral award through the courts.

The reasoning of the Singapore High Court

In making its finding, the Court reiterated that the discretion to award indemnity costs is a judicial one and should only be made in “exceptional circumstances”. The Court confirmed that an unsuccessful application to set aside or resist enforcement of an arbitral award is not treated as a matter of course as a category of exceptional circumstances in which a Singapore court may order indemnity costs. 

Having considered the positions under Hong Kong and Singapore law, the Court made the following findings: 

  • An application that turns out to be unmeritorious is not necessarily an unarguable case that hints of bad faith or one that reflects no more than an attempt to delay or impede payment. 
  • The plaintiffs had conducted their case in an economical way without undue prolongation of the hearings or submissions. 
  • In contrast, the defendants’ conduct needed some scrutiny. They had instructed senior counsel at the last minute which demonstrated that the challenge was arguable in their opinion; and this would invariably extend the hearing. 
A close-up image of a dark wooden gavel with a brass band, positioned on a matching sound block. Part of the gavel handle is visible. Three black folders or binders are slightly blurred in the background. The setting appears to be a desk or table.
  • In the course of its decision, the Court also restated the following categories of conduct that may provide good reason to order indemnity costs: 
    • where the action is brought in bad faith, as a means of oppression or for other improper purposes; 
    • where the action is speculative, hypothetical or clearly without basis; 
    • where a party’s conduct in the course of proceedings is dishonest, abusive or improper; or 
    • where the action amounts to wasteful or duplicative litigation or is otherwise an abuse of process. 
  • The Singapore High Court refused to follow the default position in Hong Kong, noting that the Hong Kong position contradicts the costs principles prescribed by the Singapore Rules of Court. 

The different initial approach between Singapore and Hong Kong

In contrast to Singapore, the Hong Kong courts adopt a default rule that indemnity costs will be granted when an arbitral award is unsuccessfully challenged in court proceedings unless “special circumstances” can be shown. This approach is a reverse of the usual court practice in Singapore and many other common law jurisdictions. 

There are three underlying principles for the approach adopted in Hong Kong. First, a party who obtains an award in their favour under an arbitration agreement should be entitled to expect that a court will enforce the award as a matter of course. This means applications by the losing party to appeal against or set aside an arbitral award should be regarded as rare events. Where such a party unsuccessfully makes this type of application, a court will typically award indemnity costs, absent “special circumstances”. [2]

Second, an unmeritorious challenge against an award is incompatible with the losing party’s duty to assist the court in the just, cost-effective, and efficient resolution of a dispute. This duty is an underlying objective of the Civil Justice Reform introduced in Hong Kong in 2009. 

Third, the losing party should bear the full cost consequence of bringing an unsuccessful application. Having already won the arbitration, the winning party should not be made to incur costs arising from the losing party’s attempt to challenge the award, as this would encourage the bringing of unmeritorious challenges.  

A traditional Chinese junk boat with vibrant red sails glides on the water in front of a modern city skyline featuring tall skyscrapers. The background includes a mountainous landscape under a cloudy sky, subtly hinting at the cost implications of challenging an arbitral award through the courts.

What happens in New Zealand

In New Zealand, an appeal against an arbitral award can only be brought on a question of law. The “ins and outs” of challenging an arbitral award on a point of law in New Zealand are discussed by Hannah Stanley and Melissa Perkin in their article Limits to Appeals in Arbitral Awards in ReSolution, Issue 28. However, the approach on costs in New Zealand to an unsuccessful appeal of an arbitral award reflects the position in Singapore. This was confirmed in a recent High Court costs decision, Napier City Council v H2O, where an award of increased costs (not indemnity costs) was sought after a party applied for leave to appeal an arbitral award [3].

The High Court Rules (HCR 14.6) provide that the Court may order a party to pay increased costs or indemnity costs in certain circumstances. For an award of increased costs, these include if the complexity or time involved would substantially exceed the maximum scale costs that could be awarded, or the party opposing costs has contributed unnecessarily to the time or expense involved. For an award of indemnity costs, they include where a party has acted vexatiously, frivolously, improperly, or unnecessarily in commencing, continuing, or defending a proceeding or a step in a proceedingThe court also retains its discretion if some other reason exists which justifies the court making an order for increased or indemnity costs. 

A cylindrical building with a unique, modern architectural design, featuring rows of horizontal windows and a flagpole on top with a blue flag bearing a red and white design, set against a clear blue sky.

In Napier City Council v H2O, the defendant (the winner in the arbitration) asked for party/party scale costs but with a 50 per cent uplift “due to the untenable application and arguments” pursued by the plaintiff. It argued increased costs were justified because the arguments made by the plaintiff were “hopeless”. 

The Court found the plaintiff did not take an unnecessary step or pursue an argument that lacked merit. Although the application was ultimately dismissed and the Court had found that the plaintiff’s challenge did not raise a question of law but was a challenge to an unfavourable interpretation of the award for the plaintiff, it said the plaintiff’s arguments at the substantive hearing did not meet the threshold of lacking merit. There was also no evidence to show that it was apparent to the plaintiff that its arguments were wholly untenable from the commencement of the proceedings. 

Conclusion

The underlying principle for an award of costs to be made by the courts in New Zealand is that the determination of costs should be “predictable and expeditious” [4]. The position in New Zealand is that an arbitral award can only be challenged on a point of law, which is a difficult threshold itself. If a party does unsuccessfully challenge an arbitral award, the decisions out of the Singapore courts are likely to be of assistance in determining whether increased or indemnity costs could be sought. However, the mere fact that the application is unsuccessful is not a sufficient basis for such a claim. 

References

[1] BTN v BTP [2021] SGHC 38.

[2] There currently appears to be no clear guidance from the Hong Kong courts as to what matters qualify as “special circumstances” and would result in a departure from the making of an order on indemnity costs.

[3] Napier City Council v H2O Management (Napier) Ltd [2020] NZHC 2481.

[4] HCR 14.6(3)(d) in relation to increased costs and HCR 14.6(4)(f) in relation to indemnity costs – High Court Rule 2016 and their equivalent in the District Court Rules.

Other resources you might like

If you found this article helpful and are interested in learning more, there is a wealth of other resources available on our website. We have a wide array of articles and guides on a variety of topics, each designed to provide you with a deeper understanding of the subject matter. We encourage you to explore these resources and deepen your knowledge.

Two people shaking hands across a desk, one wearing a dark suit and the other without a visible outfit. A document and a pen are on the desk, with a laptop partially visible beside them, suggesting a business or professional agreement.

It’s Time: How New Zealand can bring together Latin America and Asia

Is it time for work to begin again on the Southern Link project? Here, we identify the opportunities which have arisen since the easing of COVID-19 restrictions, and how New Zealand can take advantage of these.
The image shows the iconic Big Ben clock tower in London on a cloudy day. Surrounding the clock tower are other historic buildings of the Houses of Parliament, with several birds flying nearby. The scene captures a classic view of central London's architecture.

Is a party required to accept non-contractual performance during a force majeure event?

The English Court of Appeal made waves in the last part of 2022 with its decision in MUR Shipping BV v RTI Ltd [2022] EWCA Civ 1406. On a non-unanimous basis, the Court of Appeal held that a party had not been entitled to rely on a force majeure clause to suspend performance. While the decision turned on the drafting of the particular force majeure clause in question, it attracted widespread attention because of its finding that the party should have accepted an offer of non-contractual performance.
Three people in business attire gathered around a table. Two are shaking hands while standing, and the third person, holding a laptop, stands nearby. A smartphone, coffee cup, and a rectangular planter are visible on the white conference table.

Court orders parties back to arbitration

The recent case of Sesderma, S.L. v Seeky International Limited and Golong Co. Ltd [2023] HKCFI 1619, heard in the Hong Kong Court of First Instance, examined the law of issue estoppel and the governing law of arbitration agreements.

An issue estoppel arose as a prior Hong Kong Court ruling held that the contract between the disputing parties which contained an exclusive jurisdiction clause had been superseded by the contract containing a China International Economic and Trade Arbitration Commission (CIETAC) arbitration clause.

The Court found that regardless of the issue estoppel the parties were bound by the arbitration clause and the proceedings were stayed.